FEATURED JOBS! (FEBRUARY 2025)

For February’s job of the month, we took this entire bathroom down to the studs and installed all new purple board around the room, finished, prepped and painted it, installed an Onyx solid surface shower with a bench seat and a glass partition, a new ceramic tile floor with the Schluter System underneath to waterproof it, a Bertch vanity with a matching mirror and a cultured marble top, all new Delta fixtures and a new American Standard comfort height toilet.  This bathroom has a drastic before and after that we love!  It turned out great!    BEFORE AFTER

FEATURED JOBS! (JANUARY 2025)

This job of the month has some great before and after photos!  We gutted the entire room down the to the studs.  We replaced the blue tub and pink and blue tile with a white acrylic walk in shower complimented by oil rubbed bronze fixtures, grab bars, and a bench seat for safety.  Outside of the shower area, we installed wood wainscoting around the entire room, finished the drywall and painted above, a new closet and entry door, a Bertch vanity with a Serenity quartz top, a Karndean glue down luxury vinyl floor, and a Kohler Highline toilet.  This bathroom turned out beautiful. BEFORE AFTER

FEATURED JOBS (DECEMBER 2024)

On the final “job of the month” for 2024, we ended the year with a beautiful blue bathroom!  This job entailed removing all of the wallpaper, finishing the drywall and painting the entire room.  We installed an acrylic tub and walls with double shower heads, a semi-frameless door with 5/16 inch heavy glass, a cobalt blue Bertch vanity and cultured marble top, and a Karndean luxury vinyl glue down floor.  Check out the before and after pictures! BEFORE AFTER