FEATURED JOBS (DECEMBER 2024)

On the final “job of the month” for 2024, we ended the year with a beautiful blue bathroom!  This job entailed removing all of the wallpaper, finishing the drywall and painting the entire room.  We installed an acrylic tub and walls with double shower heads, a semi-frameless door with 5/16 inch heavy glass, a cobalt blue Bertch vanity and cultured marble top, and a Karndean luxury vinyl glue down floor.  Check out the before and after pictures!

BEFORE

AFTER

LEAVE REPLY

Your email address will not be published. Required fields are marked *