FEATURED JOBS! (APRIL 2025)

In this month’s featured job of the month, we removed the existing shower and garden tub and replaced it with a new, bigger Onyx solid surface shower with a bench seat, Delta handheld shower head with a diverter and a 3/8” glass Alumax barnstyle shower door.  Outside of the shower area, we installed a ceramic tile floor with the Schluter system underneath and new Bertch cabinetry, custom to match the set up of the old cabinetry.  This includes an Onyx solid surface double bowl sink and a cabinet on top of the sink for more storage.  This bathroom turned out beautiful!  BEFORE AFTER BEFORE AFTER BEFORE AFTER

FEATURED JOBS! (MARCH 2025)

March’s job of the month was a big project.  We took a storage room in the downstairs of a house and turned it into a beautiful bathroom with a huge walk in, wheelchair accessible, curbless shower.  This bathroom includes a 72×48 shower with Onyx solid surface walls and a tile base that has no curb and seamlessly transitions to the tile floor that goes throughout the rest of the bathroom.  We then installed 2 Bertch linen cabinets with crown molding  next to the shower that we framed in ourselves for ample storage.  Across from the shower, we installed another linen cabinet along with 72 inches of base cabinets, leaving the end where the sink is open to make it accessible for someone in a wheelchair.  We installed a custom quartz top, and 2 lighted mirrors.  This bathroom might be one of the most beautiful ones we’ve installed! BEFORE AFTER

FEATURED JOBS! (FEBRUARY 2025)

For February’s job of the month, we took this entire bathroom down to the studs and installed all new purple board around the room, finished, prepped and painted it, installed an Onyx solid surface shower with a bench seat and a glass partition, a new ceramic tile floor with the Schluter System underneath to waterproof it, a Bertch vanity with a matching mirror and a cultured marble top, all new Delta fixtures and a new American Standard comfort height toilet.  This bathroom has a drastic before and after that we love!  It turned out great!    BEFORE AFTER

FEATURED JOBS! (JANUARY 2025)

This job of the month has some great before and after photos!  We gutted the entire room down the to the studs.  We replaced the blue tub and pink and blue tile with a white acrylic walk in shower complimented by oil rubbed bronze fixtures, grab bars, and a bench seat for safety.  Outside of the shower area, we installed wood wainscoting around the entire room, finished the drywall and painted above, a new closet and entry door, a Bertch vanity with a Serenity quartz top, a Karndean glue down luxury vinyl floor, and a Kohler Highline toilet.  This bathroom turned out beautiful. BEFORE AFTER