This was a fun one! On this Full Service job, we completely rearranged a basement bathroom! We moved the shower to the opposite side of the room; making it much larger! We constructed the new shower with an Onyx base and walls. We replaced the old shower with a beautiful cobalt Bertch vanity and mirror. Utilizing the Schluter waterproofing and tiling System, we replaced the floor with a sharp, new Tile Floor. Various other improvements include a new toilet, lightbar, and fresh coat of paint! Take a look!
BEFORE
![BEFORE](https://bathprowpa.com/wp-content/uploads/2023/01/IMG_2298-2-768x1024.jpg)
AFTER
![AFTER](https://bathprowpa.com/wp-content/uploads/2023/01/38689-3.jpeg)
BEFORE
![](https://bathprowpa.com/wp-content/uploads/2023/01/IMG_2297-1-768x1024.jpg)
AFTER
![](https://bathprowpa.com/wp-content/uploads/2023/01/38688-1.jpeg)